FOR FEEDBACK & CONTACT
WASTEWATER TREATMENT & REFUSE
A wastewater treatment plant will be installed at a minimum distance of 15m from the amenity building. This unit will be sized to accommodate 50 pitches and will be specifically designed to handle the seasonal occupancy fluctuations of a campsite.
A drive over wastewater disposal point for grey waste will be located in front of the amenity building. This will be connected to the primary sewage treatment system.
CHEMICAL WASTE
A chemical waste disposal point with built in flush will be installed to the south of the amenity building. This will be connected to its own collection tank as will require regular uplift and cannot be connected to the main sewerage system.
RECYCLING POINT
A clearly marked rubbish disposal and recycling area will be located adjacent to the chemical waste disposal point.